Museum Regensburg

09.06.2018: Big opening ceremony:
Prime Minister Markus Söder opened the doors to the public for the first time at a ceremony on Saturday 9 June 2018. See pictures.

28.03.2018: News zum Bauvorhaben MdBG Regensburg:
he steel construction for the glass roof in the foyer was completed. See pictures.

08.08.2017: Museum of Bavarian History:
The assembly work at the Museum of Bavarian History in Regensburg is about to be completed. In the coming months, large glazing elements as well as ventilated façade cladding (profiled ceramic panels) will be installed here. This project features high-quality materials and modern, timeless design.

Museum of Bavarian History – Germany
Description: Installation glass element by Inoclad Engineering
Running time: 00:00:27
Format: H264 - MPEG-4
File size: 52.281 KB
Width: 1.920 px
Height: 1080 px


INOCLAD ENGINEERING

„Put your building project in the best hands!"

Would you like to realize a challenging, ambitious building project? If so, contact us and let our skilled employees advise you!

CONTACT

  • Justus von Liebig-Str. 3
    74532 Ilshofen
    Germany
  • info@inoclad.com
  • +49 (0) 7904 94 29 09-0
  • +49 (0) 7904 94 29 09-640

Menu

Cookies make it easier for us to provide you with our services. With the usage of our services you permit us to use cookies.
PRIVACY OK DECLINE